MAEDA(SHENZHEN)CONSTRUCTION TECHNOLOGY Co.,Ltd
Employer | State Grid Fujian Electric Powre Co., Ltd. |
---|---|
Location | Suikouzhen, Fujian, China |
Designer | HYDRO CHINA HUADONG ENGINEERING CORPORATION |
Contractor | Sinohydro Bureau Company Limited, Power China No.16, 12, 4 and Maeda Corporation JV |
Construction Period | January 1987 to January 1994 |
Outline | Dam Height: 101m Dam Length: 786m Excavation: 9,300,000m3 Concrete Work: 3,240,000m3 Dam Volume: 2,350,000m3 Capacity: 200MW x 7nos |
Employer | China Guangdong Nuclear Power Group. |
---|---|
Location | Daya Bay, Guangdong, China |
Designer | Franco-Américaine de Constructions Atomiques |
Contractor | Maeda Corporation |
Construction Period | September 1986 to March 1992 |
Outline | Nuclear Power Plant: 900,000KW x 2nos Total Area: 1,234,000m2 Building Area: 35,100m2 Total Floor Area: 96,000m2 Excavation: 1,07,200m3 Concrete Work: 373,740m3 Reinforcement Work: 45,300ton Steel Structure Work: 8,100ton |