Taiwan

Taiwan Office

Taipei Metro Songshan Line CG590A section (A925-95-XEH-04K)

Taipei Metro Songshan Line CG590A section
(A925-95-XEH-04K)

Employer Organization of the Central District Project Office, Department of Rapid Transit Systems, Taipei City Government
Location Taipei City, Taiwan
Designer Moh and Associates, Inc. and Pacific Engineers & Constructors, Ltd.
Contractor Maeda Corporation
Construction Period 18th December 2006 to 26th March 2014
Outline 2,906 m from the north side of Ximen Station to Songjiang Nanjing Station
Ximen Station (new construction): 171.4 m long, 31–33.4 m wide, 32.1 m deep (excavation depth: 35.1 m)
Zhongshan Station (new construction): A new station of the Songshan Line built on the existing Danshui Line. 99 m long, 23.2 m wide, 26.1 m deep.
Songjiang Nanjing Station (new construction): A new station of the Songshan Line built on the existing Xinzhuang Line. 201.5 m long, 26.4 m wide, 20.2 m deep.
Tunnel driven with closed shield tunneling machine 4,394 m, cut-and-cover tunnel 163 m

Orange Line CO2 Section General Contract (No.90V3C0003)

Orange Line CO2 Section General Contract
(No.90V3C0003)

Employer Kaohsiung Rapid Transit Corporation
Location Kaohsiung City, Taiwan
Designer MAEDA-LONG DA Joint Venture
Contractor MAEDA-LONG DA Joint Venture
Construction Period 8th October 2002 to 31st October 2007
Outline Closed Tunnel Boring Machine, Culvert Construction, Cut & Fill Work, Underground Diaphragm Wall, Earth
Retaining/Temporary Coffering.
Total length 2,525m, Internal Diameter, 5,600mm, Segment External Dia. 6,100mm

Photograph of Hualien deep-sea water works (EN-94009)

Photograph of Hualien deep-sea water works
(EN-94009)

Employer Taiwan Fertilizer Co., Ltd. Hualien deep-sea water investment plan - water intake facilities turnkey construction
Location Hualien City, Taiwan
Designer MAEDA-TOYO Joint Venture
Contractor MAEDA-TOYO Joint Venture
Construction Period 1st November 2005 to 30th September 2007
Outline Laying of deep-sea water intake pipes at a depth of 662m for a length of 5,300m (advance: 300m, burial: 1,250m and burial: 3,750m)
High density polyethylene (HDPE) pipes with an inner diameter of 258mm. Daily water intake: 2,000 tons
Laying of surface water intake pipes and spare pipes, and construction of an intake pump chamber and a control building