Employer | Hong Kong Government Highway Department |
---|---|
Location | MaWan Island |
Designer | Leonhardt, Andra und Partner Greiner International Ltd. |
Contractor | Kumagai-Maeda-Yokogawa-Hitachi Joint Venture |
Construction Period | December 1992 to May 1997 |
Outline | Bridge Length : 705m, Intermediate Span 430m MaWan Viaducts : Total length 503m Concrete work: 130,000m3 Reinforcement work: 9,900t |
Employer | Hong Kong Government Highway Department |
---|---|
Location | West Kowloon District |
Designer | Freeman Fox Maunsell |
Contractor | Kumagai-Maeda CREC Joint Venture |
Construction Period | August 1993 to January 1997 |
Outline | Precast Segment Balance Cantileber Method 2 layer, 3 lanes each way (Total 6 lanes) Concrete work:159,800m3 Reinforcement work:33,800t |
Employer | Mas Transit Railway Corporation |
---|---|
Location | Tsing Yi Island |
Designer | MTR Corporation Ltd. |
Contractor | Maeda Corporation |
Construction Period | December 1994 to March 1998 |
Outline | New station for air port railway line. Station connected to 4 lines (air port rapid line and local line) and 7 stories RC structure commercial building. (Total floor area):210,000m2 (concrete):240,000m3 (reinforcement):35,000t |
Employer | The Provisional Airport Authority |
---|---|
Location | Lantau Island |
Designer | Airport Authority Hong Kong |
Contractor | AMEC-BALFOUR BEATTY-CHINA STATE-KUMAGAI-MAEDA Joint Ventre as BCJ Joint Venture |
Construction Period | January 1995 to October 1997 |
Outline | New station for air port railway line. Station connected to 4 lines (air port rapid line and local line) and 7 stories RC structure commercial building. (Total floor area):210,000m2 (concrete):240,000m3 (reinforcement):35,000t |
Employer | Hong Kong Government Highway Department |
---|---|
Location | Hung Hom |
Designer | Maunsell Consultants Asia Ltd. |
Contractor | Meada - Chun Wo Joint Venture |
Construction Period | March 1996 to March 1999 |
Outline | The construction of 1~2 lanes viaduct (approx.1,500m) which connect Hung Hom Bypass and Margarete Road and 2~4 lanes viaduct (approx.900m) which is located in filled gound at Hung Hom bay. (Concrete):132,000m3 (Reinforcement):16,000t |
Employer | Kowloon-Canton Railway Corporation |
---|---|
Location | Kam Tin~Tin Shui Wai Tin Shui Wai~Lam Tin |
Designer | Ove Arup & Partners Hong Kong Ltd. |
Contractor | Meada - Chun Wo Joint Venture |
Construction Period | July 1997 to October 2003 |
Outline | The construction of railway viaduct for CC201 section (5.6km) and CC211 section (4.3km). Nos. of Pier: 1,126nos |
Employer | Mass Transit Railway Corporation Limited |
---|---|
Location | Ngong Ping 360, Lantau Island |
Designer | MTR Corporation Ltd. |
Contractor | Maeda Corporation |
Construction Period | December 2003 to Nevember 2005 |
Outline | Building area: Tung Chung Station:1,780m2、 Ngong Ping Station:1,240m2 Total floor area:Tung Chung Station:2,810m2、 Ngong Ping Station:1,312m2 Station building for Ropeway (Tung Chung Station and Ngong Ping Station) Foundation for steel tower 8 locations. Direction change tower Constructionof team area at Ngong Ping Station Concfete:34,700m3 Reinforcement:5,540t Formwork:104,000m3 |
Employer | Territory Development Department, Hong Kong |
---|---|
Location | Tai wai ~ Sha Tin |
Designer | Maunsell Consultants Asia Ltd. |
Contractor | Meada-Barbican-Hsin Chong Joint Venture |
Construction Period | March 2003 to June 2008 |
Outline | Viaduct total length:4,000m public road paving area:89,969m2 PC tunnel(4lanes each 2 lanes):length 204m Concrete:166,100m3 Reinforcement:27,500t Formwork:235,800m3 |
Employer | Hong Kong Government Highway Department |
---|---|
Location | Tsing Yi Island ~ kowloon Stonecutters Island |
Designer | Ove Arup & Partners Hong Kong Ltd |
Contractor | Maeda-Hitach-Yokokawa-Hsin Chong Joint Venture |
Construction Period | April 2004 to October 2009 |
Outline | Bridge length:1,596m height of main pier:298m Excavation with breacing:42,900m3 Concrete:145,700m3 Reinforcement:37,100t Formwork (wooden):155,100m3 Foundation pile:108 |
Employer | NTT World Wide Communication, Hong Kong |
---|---|
Location | Tseung Kwan O, Sai Kung District |
Designer | Wong & Ouyang (HK) Ltd. |
Contractor | Hsin Chong-Maeda Joint Venture |
Construction Period | October 2011 to January 2013 |
Outline | Building area:6,680m2 Total floor area:42,800m2 |