ここからサイト共通のヘッダー情報です
Employer | |
---|---|
Location | Kawaminami Town, Koyu-gun, Miyazaki Prefecture |
Designer | |
Contractor | |
Construction Period | Completed in 2012 |
Outline | Use: Irrigation Concrete gravity dam. Dam height: 61m. Dam volume: 230,000m3. Reservoir capacity: 2,040,000m3. |
Employer | |
---|---|
Location | Shinagawa Ward, Tokyo |
Designer | |
Contractor | |
Construction Period | Completed in 2014 |
Outline | Use: Sewer line The objectives are to control inundation of the Tachiai River Basin and to improve water quality in the Katsuhsima Canal. Slurry shiedl method. Length: 980 m. Finished inner diameter: 8,500 mm. |
Employer | |
---|---|
Location | Hyuga City, Miyazaki Prefecture |
Designer | |
Contractor | |
Construction Period | Completed in 2014. |
Outline | Use: Highway tunnel Civil engineering work over a length of 3,251 m including tunnel excavation(length: 767 m)and contruction of bridge substructure. TBM(tunnel boring machine). NATM(large cross-section blasting method). |
Employer | |
---|---|
Location | Hakusan City, Ishikawa Prefecture |
Designer | |
Contractor | |
Construction Period | Completed in 2013. |
Outline | Use: Shinkansen viaduct Viaduct construction over a length of 1,228 m. Embankments; reinforced concrete rigid-framed viaducts, abutments, bridge piers and girders; prestressed concrete girders and culverts were constructed. |
Employer | |
---|---|
Location | Suzu City, Ishikawa Prefecture |
Designer | |
Contractor | |
Construction Period | Completed in 2009. |
Outline | Use: Wind power generation facilities We were engaged in investigations, design, procurement, delivery and civil engineering and electrical work for 30 wind power generators with a total height of 99.95 m, rotar diameter of 70.5 m and a rated output of 1,500 kW as an EPC operator. |
Employer | |
---|---|
Location | Chiyoda Ward, Tokyo |
Designer | |
Contractor | |
Construction Period | Completed in 2014. |
Outline | Use: Offices, commercial facilities and stores, and collective housing Large-scale renewal project including the former site of Maeda's main offices. The project is composed mainly of 30-storied offices and commercial facilities and 40-sotried housing buildings. Project site area: 2.5 ha. Total floor area: 193,600m2(total). |
Employer | |
---|---|
Location | Chuo Ward, Tokyo |
Designer | |
Contractor | |
Construction Period | Completed in 2008. |
Outline | Use: Collective housing Twin towers accommodating 58-storied high-rise condominium of Japan's highest class that adopted super high strength concrete 130N. |
Employer | |
---|---|
Location | Kitakyushu City, Fukuoka Prefecture |
Designer | |
Contractor | |
Construction Period | Completed in 2003. |
Outline | Use: Offices, commercial facilities and stores A large complex accommodating commercial facilities including specialty stores, cultural facilities such as theaters, art museums and movie theaters, and offices and other business facilities. |
Employer | |
---|---|
Location | Taito Ward, Tokyo |
Designer | |
Contractor | |
Construction Period | Completed in 2013. |
Outline | Use: Offices New office building of Heiwa Corporation designed and constructed by Maeda. Edgy design adopting double skin walls. The building has 16 stories. Total floor area is 8,722m2. |
Employer | |
---|---|
Location | Kyoto City, Kyoto Prefecture |
Designer | |
Contractor | |
Construction Period | Completed in 2009. |
Outline | Use: Accommodation facilities renewal An old established wooden Japanese inn commanding a view of the Katsura River in Arashiyama, Kyoto was renovated and reborn as a high-class inn. |
Employer | |
---|---|
Location | Ichikawa City, Chiba Prefecture |
Designer | |
Contractor | |
Construction Period | Completed in 2013. |
Outline | Use: Offices, commercial facilities and stores and collective housing Station renewal project in which we participated as a specified contractor. The project is composed of 40-storied housing buildings; and business and commercial buildings with a direct access to the station. |
Employer | |
---|---|
Location | Chiyoda Ward, Tokyo |
Designer | |
Contractor | |
Construction Period | Completed in 2013. |
Outline | Purpose: Renewal of government agencies Work for renovating the former privy council, an advisory body to the emperor, into the building of the Imperial Guard. The building was renovated into a modern office while leaving the historic exterior. |