Orange Line CO2 Section General Contract (No.90V3C0003)
工事概要
- 施設用途
- シールドトンネル
- 工事場所/Location
- Kaohsiung City, Taiwan
- 発注者/Client
- Kaohsiung Rapid Transit Corporation
- 竣工年/Year Completed
- 2007
- 設計/Design
- MAEDA-LONG DA Joint Venture
- 工事概要/
Outline of Construction
- Closed Tunnel Boring Machine, Culvert Construction, Cut & Fill Work, Underground Diaphragm Wall, Earth
Retaining/Temporary Coffering.
Total length 2,525m, Internal Diameter, 5,600mm, Segment External Dia. 6,100mm