Taipei Metro Songshan Line CG590A section (A925-95-XEH-04K)

工事概要

施設用途
シールドトンネル
工事場所/Location
Taipei City, Taiwan
発注者/Client
Organization of the Central District Project Office, Department of Rapid Transit Systems, Taipei City Government
竣工年/Year Completed
2014
設計/Design
Moh and Associates, Inc. and Pacific Engineers & Constructors, Ltd.
工事概要/
Outline of Construction
2,906m from the north side of Ximen Station to Songjiang Nanjing Station
Ximen Station (new construction) : 171.4m long, 31–33.4m wide, 32.1m deep (excavation depth : 35.1m)
Zhongshan Station (new construction) : A new station of the Songshan Line built on the existing Danshui Line. 99m long, 23.2m wide, 26.1m deep.
Songjiang Nanjing Station (new construction) : A new station of the Songshan Line built on the existing Xinzhuang Line. 201.5m long, 26.4m wide, 20.2m deep.
Tunnel driven with closed shield tunneling machine 4,394m, cut-and-cover tunnel 163m